-30c 90kw Screw Type Water Cooled Glycol Chiller for Freezing System
With effective quality and efficiency control, we produce high-quality Rotary Vane Vacuum Pump, Hot Water Absorption Chiller, Copper Tube For Heat Pump Condenser and win the trust and affirmation of customers at home and abroad. However, we still strive for improvement and maintain stable high-quality products to meet the requirements of customers. We know that talent is the foundation of the company's development, so our company continues to attract talents, retain talents and better manage human resources. Learning is a never-ending process, and we hope that learning will give birth to new strength, turn expectations into actions, and continuously promote the work. We give full play to our resources, equipment and other advantages, focus on the main line of high-quality development, and focus on product manufacturing and services. It is our responsibility to meet customer needs and exceed customer expectations.
Refrigeration flow diagram
Condenser: high-efficiency heat exchange tube to reduce power consumption. Unique tube clamp technology effectively protects the heat exchange tube.
Compressor: high efficiency, two-stage compression, wide cooling capacity adjustment range.
Semi-closed motor: liquid refrigerant cooling, low winding temperature. The operating environment is clean and the reliability is high.
Onboard starter: It is convenient for users to install and save user operation space.
Falling film evaporator: less cooling capacity charge, reducing use cost. High-efficiency heat exchange structure, energy saving is visible.
CH530 control cabinet: self-adaptive control, the unit runs more stable. The feedforward function makes the energy adjustment more sensitive. Support one-time pump frequency conversion, the system is more energy-efficient.
Cooling capacity under standard conditions: the chilled water inlet temperature is 12°C, the chilled water inlet temperature is 32°C, and the cooling water outlet temperature is 37°C.
The standard water chamber is under pressure of 1.0MPa.
Suggested hoisting method
On-site construction
Company Scenario



Storage
If the chiller needs to be stored for more than one month before installation, please do the following preventive work:
Do not tear off the protective bag on the electrical panel;
Store the refrigeration unit in a dry, vibration-free and safe place;
At least every three months, manually measure the pressure in the refrigerant circuit with a pressure gauge.
Venue requirements
Noise considerations
Place the unit in a non-noise sensitive area.
Put the shock absorber under the unit and refer to the shock absorber of the unit.
Install rubber shock absorbers on all water pipelines.
Seal all the gaps in the walls of the computer room.
Foundation
Find a hard, non-flexible mounting pad or a concrete foundation that can bear the total weight of the unit during operation. When the unit is placed, the length and width of the unit should be kept within 6.35mm.
Damping device
Provide rubber shock absorbers for all water pipes of the unit;
Use flexible wire sleeves for electrical connections.
Isolate all pipe hooks to ensure that they are not supported by the main structural beams of the building, so as to prevent vibration from being transmitted to the living and working areas.
Ensure that the pipeline does not add extra pressure to the unit.
Reserved space
Sufficient space must be left around the unit to ensure that installation and maintenance personnel can reach all maintenance parts without restriction.
Sufficient space must be reserved for compressor and condenser maintenance. The recommended value is at least 3 feet to facilitate the maintenance of the compressor and provide enough space to open the control panel door.
For a long time, the company has won the credibility of customers with its unity and forge ahead professionalism, innovative pioneering spirit and customer-oriented service principle, and has become a pioneer and leader in the application of -30c 90kw Screw Type Water Cooled Glycol Chiller for Freezing System industries at home and abroad. We have integrated the cultural gene of "boldness and courage" and the demonstration and leadership of "responsibility and commitment" into the whole process of enterprise development, comprehensively promoted the implementation of the strategy of "cultural development". Organization innovation, technology innovation, constant adjustment of development strategy, and emphasis on product quality and service are the sustainable development ways of our company.