High Quality Chiller 120HP Air Cooled Chiller Screw Chiller
In order to seek greater development, our company does not focus on the existing Steam Type Absorption Chiller, Refrigerant Canned Motor Pump, Vacuum Pump PVD N360-1 market, but actively explore new markets. The company is committed to the development of new products in the market and pursues the principle of improving product quality and treating customers wholeheartedly. We sincerely desire to build long-term cooperation and mutually beneficial trade relations with home and abroad clients.
Refrigeration flow diagram
Condenser: high-efficiency heat exchange tube to reduce power consumption. Unique tube clamp technology effectively protects the heat exchange tube.
Compressor: high efficiency, two-stage compression, wide cooling capacity adjustment range.
Semi-closed motor: liquid refrigerant cooling, low winding temperature. The operating environment is clean and the reliability is high.
Onboard starter: It is convenient for users to install and save user operation space.
Falling film evaporator: less cooling capacity charge, reducing use cost. High-efficiency heat exchange structure, energy saving is visible.
CH530 control cabinet: self-adaptive control, the unit runs more stable. The feedforward function makes the energy adjustment more sensitive. Support one-time pump frequency conversion, the system is more energy-efficient.
Cooling capacity under standard conditions: the chilled water inlet temperature is 12°C, the chilled water inlet temperature is 32°C, and the cooling water outlet temperature is 37°C.
The standard water chamber is under pressure of 1.0MPa.
Suggested hoisting method
On-site construction
Company Scenario



Storage
If the chiller needs to be stored for more than one month before installation, please do the following preventive work:
Do not tear off the protective bag on the electrical panel;
Store the refrigeration unit in a dry, vibration-free and safe place;
At least every three months, manually measure the pressure in the refrigerant circuit with a pressure gauge.
Venue requirements
Noise considerations
Place the unit in a non-noise sensitive area.
Put the shock absorber under the unit and refer to the shock absorber of the unit.
Install rubber shock absorbers on all water pipelines.
Seal all the gaps in the walls of the computer room.
Foundation
Find a hard, non-flexible mounting pad or a concrete foundation that can bear the total weight of the unit during operation. When the unit is placed, the length and width of the unit should be kept within 6.35mm.
Damping device
Provide rubber shock absorbers for all water pipes of the unit;
Use flexible wire sleeves for electrical connections.
Isolate all pipe hooks to ensure that they are not supported by the main structural beams of the building, so as to prevent vibration from being transmitted to the living and working areas.
Ensure that the pipeline does not add extra pressure to the unit.
Reserved space
Sufficient space must be left around the unit to ensure that installation and maintenance personnel can reach all maintenance parts without restriction.
Sufficient space must be reserved for compressor and condenser maintenance. The recommended value is at least 3 feet to facilitate the maintenance of the compressor and provide enough space to open the control panel door.
We are adhering to the concept of ethics, honesty, pursuit of excellence, and win-win cooperation, and we are willing to work together with colleagues from all walks of life to write a brilliant chapter in the field of High Quality Chiller 120HP Air Cooled Chiller Screw Chiller! We believe that our company will provide employees with a brilliant tomorrow, and the employees will bring us a bright future. In the face of the new competitive situation, we have studied our company's business level strategy, company level strategy and internationalization strategy, and established the system in line with our company's development path.