Matters needing attention before starting the lithium bromide unit
Usually, what we call a refrigeration system is composed of an air conditioner, a cooling tower, and a water system. As the temperature rises, the performance of the lithium bromide unit is also facing new challenges. After the unit has been dormant for a winter, it is particularly important to start the unit for the first time.

In order to ensure the normal start-up operation of the unit, we need to analyze the comprehensive data of the unit before the start-up. Through the collected data of the unit, we can find out the hidden faults of the unit. Only by troubleshooting these hidden dangers can we ensure the smooth and safe operation of the unit.
Before starting the lithium bromide refrigerator for the first time, it is necessary to check and confirm the following parameters of the unit:
1. Check and confirm the vacuum part
Vacuum is the first vitality of the lithium bromide unit, and the vacuum degree of the unit needs to be confirmed before the first start-up. When the vacuum degree of the unit is poor, it will cause many failures of the unit and affect the cooling of the unit. Generally, the vacuum degree of the unit needs to be maintained below 10mmHg for efficient and stable operation.
2. External system check confirmation
①Confirm whether the valves of the water system of the unit are open, mainly to confirm whether the inlet and outlet valves of the cooling water and the inlet and outlet of the chilled water are open. MPa or so);
② For steam-type units, it is also necessary to check whether the condensed water in the steam pipeline is drained before steaming.
③ Confirm whether the cooling tower fan is working normally and whether the tightness of the fan belt is appropriate.
3. Check and confirm the body part
① Confirm whether there is liquid in the gas-liquid separation tank at the vacuum system of the unit. If there is liquid material, drain the liquid in the gas-liquid separation tank, otherwise it will be unfavorable for the non-condensable gas in the unit to be discharged;
② Confirm whether the angle valve of each solution pump of the unit is open;
③ Confirm whether the refrigerant water bypass valve of the unit is closed.
4. Check and confirm the water room of the unit


Lithium bromide unit is essentially composed of multiple heat exchangers of different sizes. Everything follows the law of energy conservation. The scaling of the heat exchange tube in the water chamber will greatly reduce the performance of the unit and cause energy waste. Therefore, regular inspection and cleaning of the water room system of the unit can greatly improve the energy utilization rate of the unit and make the unit run more efficiently and stably.
Scaling will reduce the heat exchange efficiency of the heat exchange tube, make the cooling effect of the unit worse, and increase the energy consumption. According to the conversion between the fouling coefficient and the cooling capacity, when the fouling coefficient is 0.4m²·K/kW, there is about 0.6mm thick dirt on the inner wall of the heat transfer tube, which reduces the cooling capacity to 77%, and the cold water outlet temperature rises by 2 ℃, the energy consumption increases by 23%, and the operating efficiency of the unit is greatly reduced.
Impurities such as scale, rust and slag will block the heat exchange tube of the unit, resulting in the inability of the refrigerator to exchange heat for cooling, and even cause damage to the heat exchange tube of the unit, causing vicious water leakage failure.
Regular maintenance of the heat exchange tubes of the water system of the unit can effectively increase the heat exchange rate, reduce energy consumption and prolong the service life of the equipment.
5. Check and confirm the lithium bromide solution of the unit

With the long-term operation of the refrigeration unit and the uncontrollable vacuum degree of the unit, the quality of the lithium bromide solution will decrease, thereby corroding the unit. The impurities such as rust generated during the corrosion period will cause blockage and leakage of the heat exchanger of the unit, and the corrosion will continue to intensify, which will lead to excessive copper, iron, chlorine and other ions in the lithium bromide solution, and then produce non-condensable gas, which will eventually lead to the cooling capacity of the unit. attenuation.
Regularly sample and analyze the lithium bromide solution in the unit. Through the collected data, various indicators and parameters of the lithium bromide solution can be adjusted in a targeted manner, so as to ensure that the unit is safer and more stable during operation.

To sum up, the inspection and maintenance work before starting the refrigerator is very important. The necessary inspection and maintenance can not only improve the service life of the unit, but also reduce the operating cost of the unit.




