Nov 27, 2025 Leave a message

Fire Pipeline Renovation

Fire pipeline renovation

 

The fire protection pipeline constructed in the first phase of the company has experienced partial aging after years of operation, with frequent interface leakage and insufficient water pressure, posing safety hazards to the factory area. The company leaders attach great importance to it and have established a dedicated fire pipeline renovation construction team to solve the fire pipeline problems in the first phase of the company's construction. Faced with complex construction environments and heavy work tasks, the employees responsible for fire pipeline construction rely on a high sense of responsibility and excellent professional skills to accurately complete the installation and commissioning of each pipeline. The fire renovation project lasted for 34 days and cost nearly 100000 RMB. After the renovation, the static pressure maintenance ability of the waterway is good, and the fire water of the entire plant can be used as needed, significantly enhancing the overall risk resistance ability of the plant area. At the same time, the performance of the pipeline in terms of pressure resistance, corrosion resistance, and high temperature resistance also fully meets the standards.
The purpose of this' renovation battle 'is to ensure that every detail of the fire protection system can withstand scrutiny, so that the results of the safety upgrade after renovation can be seen and touched. The renovated fire protection system can handle various emergencies calmly, adding a solid "safety barrier" for employees, equipment, and buildings. The professional dedication of the construction team has resulted in a safe and reassuring working environment in the factory area.

news-76-144

 

Lithium bromide solution manufacturer

 

About us

Flier Refrigeration Engineering Technology Co., Ltd is a professional technical service enterprise integrating central air-conditioning host sales, spare parts sales, unit repair and maintenance.

Factory located in Zhenjiang, Jiangsu, covering an area of 25,000 square meters ,and has been built with 1 R&D center, 1 pilot plant, 3 An innovative production, learning, and research base composed of a professional production workshop and its corresponding infrastructure. At present, the company has become a well-known technical service provider in the field of central air conditioning in China.

The company's main business scope includes: central air-conditioning maintenance, cleaning and technical services; cooling tower and fan coil cleaning and maintenance services; custom processing of lithium bromide solution; sales of lithium bromide solution special impurity separators; central air-conditioning host and various zero Sales of accessories; installation and sales of central air conditioning systems, etc.

news-905-509

Contact us

Ms. Lillian GUO

Zhenjiang FLIER Refrigeration Engineering Technology Co., Ltd

Jiangsu, China

Tel: + 86 15358588768(Whatsapp)

Wechat:15358588768

E-mail: mdguolijuan@zjflier.com

 

Send Inquiry

whatsapp

Phone

E-mail

Inquiry