Jun 01, 2022 Leave a message

High Quality Production

High quality production

In recent days, although the weather and temperature have continued to rise, the epidemic has repeatedly affected production and life, but this has not affected the spirit of hard work and hard work of the Flier people. The company has received a large number of orders, which has made a good start for the company's production season. The Seiko team of the security department is also working hard to complete the order tasks, and they can be seen everywhere in the workshop. Since March, the company has received orders for 2 water heaters, 2 direct-fired generators, and 1 water heater for repairs. With the epidemic affecting logistics, the production time has become more urgent. The employees of the Seiko team rose to the challenge, were timely and accurate in reviewing drawings and cutting materials, kept improving in production, and strictly controlled the construction schedule. In order to speed up the production progress, employees carry forward the spirit of hard work, work overtime, carry forward the enterprise spirit of "pressurized forging ahead, self-improvement", promote the work progress, and strictly require quality, and resolutely prevent the occurrence of the situation that the quality is affected by the tight construction period. In the order for the rework of the water heater, the Seiko team continues to learn and apply excellent craftsmanship. In the design and production of the two recent water heaters, the Seiko Group independently designed and perfected the grid plate and the shower system, expanded the air passage area between the generator and the condenser, and optimized the spray effect. The Seiko team not only does its best work, but also does not forget to learn from each other and cooperate with each team. Since March, the Seiko group has completed the installation of the sand tank in the solution group workshop, which has been well received. When the auxiliary electrical equipment group produces electric refrigeration equipment, the Seiko group cooperated with the staff to weld nearly 20 leak points, without any rework, in one go, Completed the auxiliary tasks of the electrical group perfectly and received written praise from the electrical group. I believe that in the peak production season in the future, the Seiko team will still be able to maintain quality and quantity, improve the craftsmanship in production, and achieve better products, better self, and better Flier.


Send Inquiry

whatsapp

Phone

E-mail

Inquiry