1. Under normal operating conditions, evacuate once a week. If air is found leaking into the equipment, it should be emptied in time.
2. During winter maintenance, it is best to fill 20-30kPa nitrogen to prevent air leakage.
3. Clean up the dirt on the surface of the heat conduction tube in time.
4. Replace aging parts such as diaphragm, observation lens washer.